Tablas de rendimiento ing civil
MAQUINARIA
ESPECIFICACIONES TECNICAS
PRECIOS DE MATERIALES
BASE TEÓRICA
DATOS GENERALES DE MATERIALES PARA LA CONSTRUCCIÓN
ALBAÑILERÍA
CANTIDADES DE MATERIALES
M3 CIMIENTO MAMPOSTERIA PIEDRA: MEZCLA 1:5 (Cemento-Arena) Piedra : (25 de huecos) 1.25 M3 Mezcla : (25 huecos 10 desperdicios) 0.275 M3
DETALLE Piedra 1.25 M3 Cemento 2.20 bols. Arena 0.32 M3 Agua 60.0 litros
M3 CIMIENTO MAMPOSTERIA PIEDRA MEZCLA 1:6 (Cemento-Arena) Piedra : (25 de huecos) 1.25 M3 Mezcla : (25 huecos 10 desperdicios) 0.275 M3
DETALLE Piedra 1.25 M3 Cemento 1.93 bols. Arena 0.33 M3 Agua 68.0 litros
M3 CIMIENTO MAMPOSTERIA PIEDRA MEZCLA 1:7 …ver más…
|226 |195 |
|7 |1:2:3 |8.4 |0.47 |0.71 |216 |165 |
|8 |1:2:3.5 |7.8 |0.44 |0.76 |212 |164 |
|9 |1:2:4 |7.3 |0.41 |0.82 |211 |140 |
|10 |1:2.5:2.5 |8.3 |0.58 |0.58 |232 |156 |
|11 |1:2.5:3 |7.6 |0.54 |0.65 |222 |147 |
|12 |1:2.5:3.5 |7.2 |0.51 |0.71 |220 |132 |
|13 |1:2.5:4 |6.7 |0.48 |0.77 |218 |118 |
|14 |1:3:4 |6.3 |0.53 |0.71 |224 |94 |
|15 |1:3:4.5 |5.9 |0.50 |0.75 |217 |89 |
|16 |1:3:5 |5.6 |0.47 |0.79 |215 |80 |
|17 |1:3:6 |5.5 |0.47 |0.94